Phase 06 of 08

Architecture & Enclosure

Closing the building: roof, walls, facade, floors, industrial doors, and support spaces.

Typical duration
8–20 weeks, overlapping with structure
Workers coating a large industrial floor slab with white finish

Phase 06 in short

The building envelope sets the plant’s operating cost for decades. A badly detailed roof leaks in the first heavy rain, uninsulated walls make the cooling system work harder, and epoxy laid over concrete that has not dried delaminates within months. This phase overlaps with structure, starting in areas already under roof so that interior MEP work can begin earlier.

What we do

  1. Roofing: metal deck, insulation, vapour barrier, skylights, gutters, flashings, roof ventilators or monitors.

  2. Walls: precast panels, insulated metal panels, lightweight blockwork, or a combination driven by thermal and fire requirements.

  3. Facade and external finishes including composite panel, glazing, frames, and painting.

  4. Floors: epoxy, floor hardener, or vinyl in designated areas, with forklift aisle and safety zone marking.

  5. Industrial doors: roller shutters, sectional doors, high-speed doors, dock levellers, and dock shelters at the loading bays.

  6. Support spaces: offices, meeting rooms, canteen, changing rooms, lockers, toilets, prayer room, switch rooms, and stores.

  7. Cleanroom or temperature-controlled interior fit-out where the production process requires it.

What you receive

  • Architectural as-built drawings
  • Roof leak and water spray test results
  • Envelope material certificates and warranties
  • Colour schedule, floor marking, and area signage layout
  • Architectural defect list with close-out status
Codes and references
Roof testing Spray test before ceilings close
Epoxy floor Concrete moisture test before application
Fire resistance Per fire service clearance
Loading bay Dock leveller and dock shelter
Typical duration 8–20 weeks, overlapping with structure

Questions about this phase

When should the epoxy floor be laid?
After the concrete is dry enough and after the trades that would damage the surface are finished. Laying it early almost always ends in rework. We measure the concrete’s moisture content rather than just counting the days since the pour.
Is roof insulation worth the cost?
For air-conditioned areas, it almost always pays back through energy savings. For unconditioned warehouses, the main benefit is a lower working temperature and less condensation. We run the numbers per project rather than making it an automatic standard.

Tell us about the project.

Send the outline: location, approximate area, process type, and target production start. We will come back with the questions that need answering before any number means anything.

Email
halo@tccontractor.id
Phone
+62 21 0000 0000
Hours
Monday–Friday, 08:00–17:00 WIB