Tower crane lit above a building under construction at night

One contract.
One line of
responsibility.

We carry factory and building projects from feasibility study to keys in hand, so your production start date is not waiting on vendor coordination.

Based in
Jakarta Selatan, DKI Jakarta
Working area
Greater Jakarta, Cikarang, Karawang, Serang
Contract model
EPC turnkey · Design–Build

The gaps between design, procurement, and build.

An EPC contractor delivers Engineering, Procurement, and Construction under one contract. One party is responsible for design engineering, for buying the materials and equipment, and for building the works through to an operational facility.

The difference from a general contractor only shows when something goes wrong. When design, procurement, and construction sit with different parties, the gaps between them land on the owner. We close those gaps by holding all three.

How we work
Scope under one contract
E · EngineeringFeasibility, basic design, FEED, detailed design across architecture, structure, and MEP, with signed calculations.
P · ProcurementPackage tendering, vendor selection, long-lead ordering, contracts, factory inspection, logistics.
C · ConstructionCivil, structural, architectural, and MEP works through to commissioning and handover.
PermittingPBG, UKL-UPL or AMDAL, traffic impact analysis, fire clearance, through to the SLF at handover.

From empty land to keys in hand.

Each phase has inspectable deliverables, a named owner, and a recorded handover point. You know what is finished before the next phase starts.

  1. Planning & Feasibility

    Testing whether the project is viable on the land, budget, and schedule available.

    2–6 weeks What we do

  2. Design & Engineering

    Turning the production requirement into buildable drawings, calculations, and specifications.

    4–12 weeks What we do

  3. Permitting & Compliance

    Securing the building approval, environmental documents, and technical clearances the project needs.

    4–16 weeks, running in parallel with design What we do

  4. Procurement

    Tendering work packages, locking vendors, and ordering long-lead items on time.

    6–20 weeks, running continuously What we do

  5. Civil & Structural Works

    Preparing the site, placing foundations, and erecting the concrete and steel structure.

    12–32 weeks, depending on area and foundation type What we do

  6. Architecture & Enclosure

    Closing the building: roof, walls, facade, floors, industrial doors, and support spaces.

    8–20 weeks, overlapping with structure What we do

  7. MEP & Utilities

    Installing power, HVAC, plumbing, fire protection, wastewater treatment, and process utilities.

    10–24 weeks, partly parallel with architecture What we do

  8. Commissioning & Handover

    Testing every system, closing defects, securing the SLF, and handing over an operational building.

    4–10 weeks, plus a 6–12 month defects liability period What we do

What changes from one sector to the next.

The construction method is broadly similar. What differs is what drives the design decisions, and that is what sets your operating cost later.

Questions we are asked

What is an EPC contractor?
An EPC contractor delivers Engineering, Procurement, and Construction under a single contract. One party is responsible for design engineering, for buying the materials and equipment, and for building the works through to an operational facility. The owner deals with one accountable party rather than with a separate consultant, supplier, and builder.
How is an EPC contractor different from a general contractor?
A general contractor typically builds to a design prepared by others, so design responsibility stays with the consultant and the owner. An EPC contractor carries design and procurement responsibility as well, so the gap between "the drawings are correct" and "the building works" does not land on the owner. The difference shows most clearly when something goes wrong, because there is no room for parties to point at each other.
How long does it take to build a factory from empty land?
For a mid-scale factory or warehouse in Greater Jakarta and the surrounding industrial belt, a reasonable range is roughly 10 to 18 months from feasibility study to handover, with permitting and design running in parallel. The exact figure depends on the foundation type, the complexity of process utilities, and how quickly the local authority issues the PBG. We give a phase-by-phase schedule in Phase 01 rather than a single headline number.
What does a factory cost per square metre?
We do not quote a rate per square metre before seeing the project, because the range is too wide to be useful. The biggest cost drivers are the foundation type dictated by soil conditions, clear height and structural span, floor specification, electrical and HVAC capacity, wastewater treatment requirements, and how far the office areas are fitted out. In Phase 01 we give an estimate accurate to roughly ±25 per cent, tightening to around ±10 per cent once detailed engineering and the bill of quantities are complete.
Does TCC handle the PBG and SLF?
Yes. Permitting is Phase 03 of our work sequence, covering the PBG building approval, UKL-UPL or AMDAL environmental documents, traffic impact analysis where required, and other technical clearances. The Certificate of Fitness for Occupancy is closed out in Phase 08 together with statutory safety inspections, so the building is legally operable at handover.

Tell us about the project.

Send the outline: location, approximate area, process type, and target production start. We will come back with the questions that need answering before any number means anything.