Factory and warehouse contractor. One contract, one line of responsibility.

EPC and design-and-build contractor in Jakarta, Cikarang, and Karawang. We carry projects from feasibility study to keys in hand, so your production start date is not waiting on vendor coordination.

Based in
Jakarta Selatan, DKI Jakarta
Working area
Greater Jakarta, Cikarang, Karawang, Serang
Contract model
EPC turnkey · Design–Build

The gaps between design, procurement, and build.

An EPC contractor delivers Engineering, Procurement, and Construction under one contract. One party is responsible for design engineering, for buying the materials and equipment, and for building the works through to an operational facility.

The difference from a general contractor only shows when something goes wrong. When design, procurement, and construction sit with different parties, the gaps between them land on the owner. We close those gaps by holding all three.

How we work
Scope under one contract
E · EngineeringFeasibility, basic design, FEED, detailed design across architecture, structure, and MEP, with signed calculations.
P · ProcurementPackage tendering, vendor selection, long-lead ordering, contracts, factory inspection, logistics.
C · ConstructionCivil, structural, architectural, and MEP works through to commissioning and handover.
PermittingPBG, UKL-UPL or AMDAL, traffic impact analysis, fire clearance, through to the SLF at handover.

From empty land to keys in hand.

Each phase has inspectable deliverables, a named owner, and a recorded handover point. You know what is finished before the next phase starts.

  1. Planning & Feasibility

    Testing whether the project is viable on the land, budget, and schedule available.

    What we do

  2. Design & Engineering

    Turning the production requirement into buildable drawings, calculations, and specifications.

    What we do

  3. Permitting & Compliance

    Securing the building approval, environmental documents, and technical clearances the project needs.

    What we do

  4. Procurement

    Tendering work packages, locking vendors, and ordering long-lead items on time.

    What we do

  5. Civil & Structural Works

    Preparing the site, placing foundations, and erecting the concrete and steel structure.

    What we do

  6. Architecture & Enclosure

    Closing the building: roof, walls, facade, floors, industrial doors, and support spaces.

    What we do

  7. MEP & Utilities

    Installing power, HVAC, plumbing, fire protection, wastewater treatment, and process utilities.

    What we do

  8. Commissioning & Handover

    Testing every system, closing defects, securing the SLF, and handing over an operational building.

    What we do

What changes from one sector to the next.

The construction method is broadly similar. What differs is what drives the design decisions, and that is what sets your operating cost later.

Questions we are asked

What is an EPC contractor?
An EPC contractor delivers Engineering, Procurement, and Construction under a single contract. One party is responsible for design engineering, for buying the materials and equipment, and for building the works through to an operational facility. The owner deals with one accountable party rather than with a separate consultant, supplier, and builder.
How is an EPC contractor different from a general contractor?
A general contractor typically builds to a design prepared by others, so design responsibility stays with the consultant and the owner. An EPC contractor carries design and procurement responsibility as well, so the gap between "the drawings are correct" and "the building works" does not land on the owner. The difference shows most clearly when something goes wrong, because there is no room for parties to point at each other.
How long does it take to build a factory from empty land?
The schedule is set by foundation type, the complexity of process utilities, and how quickly the local authority issues the PBG, so there is no answer that holds generally. Permitting and design run in parallel so they do not queue behind each other. We build a phase-by-phase schedule in Phase 01, once the site and the production requirement are known, rather than quoting a single number up front.
What does a factory cost per square metre?
We do not quote a rate per square metre before seeing the project, because a figure like that is almost always wrong for a specific one. The biggest cost drivers are the foundation type dictated by soil conditions, clear height and structural span, floor specification, electrical and HVAC capacity, wastewater treatment requirements, and how far the office areas are fitted out. An estimate follows a feasibility study and soil investigation, and tightens again once detailed engineering and the bill of quantities are complete.
Does TCC handle the PBG and SLF?
Yes. Permitting is Phase 03 of our work sequence, covering the PBG building approval, UKL-UPL or AMDAL environmental documents, traffic impact analysis where required, and other technical clearances. The Certificate of Fitness for Occupancy is closed out in Phase 08 together with statutory safety inspections, so the building is legally operable at handover.

Tell us about the project.

Send the outline: location, approximate area, process type, and target production start. We will come back with the questions that need answering before any number means anything.