Phase 05 of 08

Civil & Structural Works

Preparing the site, placing foundations, and erecting the concrete and steel structure.

Typical duration
12–32 weeks, depending on area and foundation type
Blue steel framework of a large industrial building under erection

Phase 05 in short

Civil and structural work is the most visible part of the project and the hardest to correct if it goes wrong. Floor flatness tolerance, column plumbness, and the accuracy of steel holding-down bolts determine whether machinery can be installed later without expensive shimming. Everything runs under an active safety plan with documented material testing, because those test results are what gets attached to the occupancy certification later.

What we do

  1. Mobilisation, site office, hoarding, haul roads, and activation of the safety plan including worker induction.

  2. Land clearing, cut and fill, compaction, and surface water control through the wet season.

  3. Foundations per the geotechnical report: driven piles, bored piles, or pad footings, followed by pile caps and tie beams.

  4. Reinforced concrete frame: columns, beams, slabs, and stairs, with slump testing and cylinder or cube compressive testing.

  5. Production floor slab with flatness tolerance control, including floor hardener or epoxy substrate preparation.

  6. Steel fabrication and erection: columns, rafters, purlins, bracing, and crane runway beams where required.

  7. Yard paving for container traffic, drainage channels, inspection pits, and retaining walls.

What you receive

  • Structural as-built drawings
  • Concrete, reinforcement, and compaction test results
  • Steel mill certificates
  • Daily and weekly reports with S-curve progress
  • Safety records: inductions, inspections, incident reports
  • Joint inspection records at each structural milestone
Codes and references
Concrete SNI 2847:2019
Steel SNI 1729:2020
Compressive testing At 7, 14, and 28 days
Safety SMK3, mandatory induction
Typical duration 12–32 weeks, depending on area and foundation type

Questions about this phase

Can work continue through the rainy season?
Most of it can, given temporary drainage, protection over pour areas, and a resequenced work plan. What we avoid is soil compaction and large pours during heavy rainfall, because the quality cannot be guaranteed.
How flat can the production floor be made?
It depends on the requirement. A warehouse with high racking and VNA forklifts demands a far tighter tolerance than a general production area. The target is agreed back in Phase 02 because it drives the pour method and the cost.

Tell us about the project.

Send the outline: location, approximate area, process type, and target production start. We will come back with the questions that need answering before any number means anything.

Email
halo@tccontractor.id
Phone
+62 21 0000 0000
Hours
Monday–Friday, 08:00–17:00 WIB